A level dirt floor and ramp footer. In the distance a construction worker compacts soil. |
Recently the crews have started to put up the steel for the indoor ramp. The old QVC had a set of stairs connecting the upper and lower galleries inside the building. This was part of the handicap access problem of that building --- an outside ramp too steep and only stairs inside. The new QVC, with its properly sloped ramps, will allow everyone to pass through the building and get to any part of the exhibits.
With the dirt inside the skeleton of the QVC leveled, the ramp has started to go up --- footers were poured, steel beams anchored to the footers, and the framework welded to the steel beams of the building itself. This might be easily passed over as just another step in the project, but it is notable because for the first time we are building something inside the QVC. This is a moment that seemed would never arrive. We can finally see the finish line on the horizon --- although the snow and ground fog makes it a bit hard to pick out.
Photos: NPS.
No comments:
Post a Comment